see attached for the CBT log for Sept. Note: On the water order page - 3rd from last page - there are hand -written notes: Astericks on St Vrain Canal and Hansen Supply Canal to show that those flows include CBT, W. Gap, and drought deliveries; also a note that says St Vrain meter for drought contract is 363.8 af. On the Aug. log on the water order page (3rd from last page) there is a hand written note: Astericks on St Vrain canal, Big Thompson River and Hansen Supply Canal that says those flows include CBT, W. Gap and drought deliveries. Kathy