1 PICK SLOAN MISSOURI BASIN PROGRAM UNITED STATES BUREAU OF RECLAMATION WESTERN DIVISION WATER AND POWER SYSTEM AS OF 05/07/01 WATER AND POWER CONTROL DIVISION TIME: 11:03:34 LOVELAND, COLORADO APRIL 2001 EASTERN COLORADO PROJECTS DILLON RESERVOIR - COMPUTATION OF DAILY INFLOWS O U T F L O W GAIN LAKE TOTAL VALVES SPILL TOTAL ROBERTS TOTAL CHANGE COMPUTED COLO. UNDE- D I L L O N DILLON- TO IN SPGS. PLETED PREC TEMP EVAP GREEN DAY ELEV STORAGE RIVER TUNNEL OUTFLOW STORAGE INFLOW DEP INFLOW MTN (FEET) (AF) (CFS) (CFS) (CFS) (CFS) (AF) (AF) (AF) (CFS) (CFS) (CFS) (IN) MAX MIN (AF) (CFS) 205316 1 9000.39 205101 52 0 52 151 406 -215 191 96 0 96 0.00 54 28 0 82 2 9000.31 204887 52 0 52 151 406 -214 192 96 0 96 0.00 53 24 0 97 3 9000.21 204619 52 0 52 176 456 -268 188 94 0 94 0.00 56 24 0 136 4 9000.11 204351 52 0 52 245 594 -268 326 163 0 163 0.00 59 24 0 96 5 8999.98 204004 52 0 52 246 596 -347 249 125 0 125 0.00 51 26 0 159 6 8999.81 203550 52 0 52 248 600 -454 146 73 0 73 0.19 49 21 0 117 7 8999.74 203363 52 0 52 248 600 -187 413 207 0 207 0.00 44 21 0 150 8 8999.62 203043 52 0 52 246 596 -320 276 138 0 138 0.00 43 14 0 95 9 8999.45 202591 88 0 88 246 668 -452 216 108 0 108 0.00 49 14 0 59 10 8999.35 202326 98 0 98 242 680 -265 415 208 0 208 0.44 46 21 0 112 11 8999.23 202007 98 0 98 176 548 -319 229 115 0 115 0.03 34 9 0 143 12 8999.11 201689 98 0 98 163 522 -318 204 102 0 102 0.00 39 9 0 84 13 8999.00 201398 98 0 98 163 522 -291 231 116 0 116 0.00 40 11 0 115 14 8998.89 201108 98 0 98 163 522 -290 232 116 0 116 0.00 39 13 0 94 15 8998.71 200632 98 0 98 230 656 -476 180 90 0 90 0.00 51 19 0 72 16 8998.55 200211 98 0 98 250 696 -421 275 138 0 138 0.00 55 20 0 130 17 8998.41 199842 98 0 98 250 696 -369 327 164 0 164 0.00 61 21 0 98 18 8998.23 199370 98 0 98 250 696 -472 224 112 0 112 0.00 64 26 0 131 19 8998.16 199186 98 0 98 250 696 -184 512 256 0 256 0.00 56 32 0 181 20 8998.05 198898 98 0 98 250 696 -288 408 204 0 204 0.00 41 21 0 154 21 8997.98 198714 98 0 98 250 696 -184 512 256 0 256 0.32 47 23 0 156 22 8997.96 198662 98 0 98 126 448 -52 396 198 0 198 0.06 30 20 0 174 23 8997.92 198557 98 0 98 101 398 -105 293 147 0 147 0.00 37 21 0 153 24 8997.90 198505 98 0 98 101 398 -52 346 173 0 173 0.00 50 21 0 164 25 8997.89 198479 98 0 98 101 398 -26 372 186 0 186 0.00 58 22 0 159 26 8997.83 198322 98 0 98 191 578 -157 421 211 1 212 0.00 61 24 0 181 27 8997.77 198165 98 0 98 234 664 -157 507 254 1 255 0.00 65 27 0 200 28 8997.73 198061 98 0 98 240 676 -104 572 286 1 287 0.00 60 29 0 241 29 8997.76 198139 98 0 98 242 680 78 758 379 1 380 0.00 59 29 0 273 30 8997.81 198270 9 61 70 242 624 131 755 378 2 380 0.00 61 30 0 334 TOTAL CFS 2473 61 2534 6172 5189 6 5195 4340 TOTAL AF -7046 4946 122 5068 12344 17412 -7046 10366 10366 12 10390 1.04 50 21 0 8680 NOTE: USE FACTOR OF 2.0 TO CONVERT CFS TO AF/DAY, 0.5 TO CONVERT AF/DAY TO CFS 1 PICK SLOAN MISSOURI BASIN PROGRAM UNITED STATES BUREAU OF RECLAMATION WESTERN DIVISION WATER AND POWER SYSTEM AS OF 05/07/01 WATER AND POWER CONTROL DIVISION TIME: 11:03:34 LOVELAND, COLORADO APRIL 2001 EASTERN COLORADO PROJECTS GREEN MOUNTAIN RESERVOIR - COMPUTATION OF DAILY INFLOWS O U T F L O W DEPLETIONS GREEN MOUNTAIN DOTSERO LAKE TOTAL TUR- BY- CHANGE COMPUTED COLO. UNDE- T O T A L IN DENVER PLETED PREC TEMP DAY ELEV STORAGE BINES PASS STORAGE INFLOW SPGS. INFLOW (FEET) (AF) (CFS) (CFS) (CFS) (AF) (AF) (AF) (CFS) (CFS) (CFS) (CFS) (IN) MAX MIN (CFS) 50019 1 7880.52 49991 146 0 146 278 -28 255 134 44 0 178 0.00 54 29 906 2 7880.52 49991 146 0 146 290 0 295 149 44 0 193 0.00 56 27 913 3 7880.60 50065 148 0 148 294 74 373 188 42 0 230 0.00 60 27 953 4 7880.60 50065 145 0 145 288 0 293 148 111 0 259 0.00 56 26 1010 5 7880.74 50195 143 0 143 284 130 419 211 73 0 284 0.00 54 31 1030 6 7880.79 50242 143 0 143 284 47 336 169 21 0 190 0.00 49 26 1095 7 7880.91 50353 143 0 143 284 111 400 202 155 0 357 0.00 47 25 1120 8 7880.91 50353 144 0 144 286 0 291 147 86 0 233 0.16 41 21 1050 9 7880.91 50353 144 0 144 286 0 291 147 20 0 167 0.00 49 21 963 10 7881.06 50494 136 0 136 270 141 416 210 110 0 320 0.44 46 24 919 11 7881.26 50682 144 0 144 286 188 479 241 17 0 258 0.04 38 18 960 12 7881.33 50748 146 0 146 290 66 361 182 4 0 186 0.00 43 22 977 13 7881.35 50767 201 0 201 399 19 423 213 18 0 231 0.00 44 21 978 14 7881.06 50494 327 0 327 649 -273 381 192 18 0 210 0.00 45 20 1010 15 7880.72 50177 327 0 327 649 -317 337 170 -8 0 162 0.00 54 24 1070 16 7880.50 49973 328 0 328 651 -204 452 228 40 0 268 0.00 58 23 1110 17 7880.21 49703 329 0 329 653 -270 388 196 66 0 262 0.00 64 25 1180 18 7879.98 49490 334 0 334 662 -213 454 229 14 0 243 0.00 66 43 1320 19 7879.86 49379 333 0 333 660 -111 554 279 158 0 437 0.00 60 34 1510 20 7879.84 49361 258 0 258 512 -18 499 252 106 0 358 0.00 48 23 1690 21 7880.16 49657 102 0 102 202 296 503 254 158 0 412 0.00 45 26 1600 22 7880.52 49991 101 0 101 200 334 539 272 100 0 372 1.13 28 20 1310 23 7880.84 50288 99 0 99 196 297 498 251 49 0 300 0.00 42 28 1140 24 7881.05 50484 161 0 161 319 196 520 262 75 0 337 0.00 53 24 1063 25 7881.16 50588 202 0 202 401 104 510 257 88 0 345 0.00 60 26 1240 26 7881.18 50607 267 0 267 530 19 554 279 113 1 393 0.00 66 28 1480 27 7881.06 50494 353 0 353 700 -113 592 298 156 1 455 0.00 70 35 1730 28 7881.35 50767 199 0 199 395 273 673 339 188 1 528 0.00 62 33 2190 29 7881.91 51294 103 0 103 204 527 736 371 281 1 653 0.00 63 30 2190 30 7882.53 51885 104 0 104 206 591 802 404 308 2 714 0.00 62 45 2200 TOTAL CFS 5856 0 5856 6874 2655 6 9535 37907 TOTAL AF 1866 11608 0 11608 11608 1866 13624 13626 5262 12 18897 1.77 53 27 75112 NOTE: USE FACTOR OF 1.98347 TO CONVERT CFS TO AF/DAY, 0.50417 TO CONVERT AF/DAY TO CFS FACTORS=2.066116 AND.483988 FOR 25 HR/DAY 1.900825 AND .526087 FOR 23 HR/DAY 1 PICK SLOAN MISSOURI BASIN PROGRAM UNITED STATES BUREAU OF RECLAMATION WESTERN DIVISION WATER AND POWER SYSTEM AS OF 05/07/01 WATER AND POWER CONTROL DIVISION TIME: 11:03:34 LOVELAND, COLORADO APRIL 2001 EASTERN COLORADO PROJECTS WILLOW CREEK RESERVOIR - COMPUTATION OF DAILY INFLOWS O U T F L O W CHANGE LAKE TOTAL TO TO MC- BUNTE SEEP- CANAL TOTAL OUTFLOW IN COMPUTED INFLOW ELEV STORAGE RIVER QUEARY HIGHLINE AGE1/ PRIMING PUMPED STORAGE DAY (FEET) (AF) (CFS) (CFS) (CFS) (CFS) (CFS) (CFS) (CFS) (AF) (AF) (AF) (CFS) 8921 1 8124.30 8955 7 0 0 1 0 0 8 15 34 50 26 2 8124.43 8989 7 0 0 1 2 0 10 20 34 55 28 3 8123.66 8790 7 0 0 1 21 100 129 256 -199 58 29 4 8120.75 8072 7 0 0 2 0 365 374 742 -718 25 13 5 8118.41 7534 7 0 0 3 0 283 293 581 -538 44 22 6 8117.38 7309 7 0 0 3 0 146 156 309 -225 85 43 7 8117.61 7359 7 0 0 2 0 0 9 18 50 69 35 8 8117.86 7413 7 0 0 1 0 0 8 16 54 71 36 9 8118.10 7466 7 0 0 1 0 0 8 16 53 70 35 10 8118.19 7486 7 0 0 1 10 0 18 36 20 57 29 11 8118.29 7508 7 0 0 1 8 14 30 60 22 83 42 12 8118.45 7543 7 0 0 1 0 0 8 16 35 52 26 13 8118.65 7588 7 0 0 1 0 0 8 16 45 62 31 14 8118.84 7631 7 0 0 1 0 0 8 16 43 60 30 15 8119.00 7667 7 0 0 1 0 0 8 16 36 53 27 16 8119.20 7712 6 0 0 1 0 0 7 14 45 60 30 17 8119.44 7767 7 0 0 1 0 0 8 16 55 72 36 18 8119.75 7839 6 0 0 1 0 0 7 14 72 87 44 19 8120.15 7931 8 0 0 1 0 0 9 18 92 111 56 20 8120.59 8035 7 0 0 1 0 0 8 16 104 121 61 21 8120.95 8120 7 0 0 1 0 0 8 16 85 102 51 22 8121.30 8204 7 0 0 1 0 0 8 16 84 101 51 23 8121.45 8240 7 0 0 1 11 0 19 38 36 75 38 24 8120.46 8004 7 0 0 1 17 135 160 317 -236 82 41 25 8118.63 7584 7 0 0 2 0 240 249 494 -420 75 38 26 8118.30 7510 7 0 0 1 0 89 97 192 -74 119 60 27 8118.80 7622 7 0 0 1 0 0 8 16 112 129 65 28 8119.57 7797 7 0 0 1 0 0 8 16 175 192 97 29 8120.46 8004 7 0 0 1 0 0 8 16 207 224 113 30 8120.44 7999 7 0 0 1 21 84 113 224 -5 220 111 TOTAL CFS 209 0 0 37 90 1456 1792 1344 TOTAL AF -922 417 0 0 74 180 2889 3556 3556 -922 2664 2664 NOTE: USE FACTOR OF 1.98347 TO CONVERT CFS TO AF/DAY, 0.50417 TO CONVERT AF/DAY TO CFS FACTORS=2.066116 AND.483988 FOR 25 HR/DAY 1.900825 AND .526087 FOR 23 HR/DAY 1/ INCLUDES PUMP CANAL WASTE 1 PICK SLOAN MISSOURI BASIN PROGRAM UNITED STATES BUREAU OF RECLAMATION WESTERN DIVISION WATER AND POWER SYSTEM AS OF 05/07/01 WATER AND POWER CONTROL DIVISION TIME: 11:03:34 LOVELAND, COLORADO APRIL 2001 EASTERN COLORADO PROJECTS WINDY GAP PROJECT DAILY FLOWS COLO R. FRASER R. PUMPED FROM COLO R. PRECIP ABOVE AT CONFLU. WINDY GAP BELOW AT W.GAP FRASER RESERVOIR W.GAP RESER. RESERVOIR DAY (CFS) (CFS) (CFS) (AF) (CFS) (IN) 1 0 0 0 0 0 0.00 2 0 0 0 0 0 0.00 3 0 0 0 0 0 0.00 4 0 0 0 0 0 0.00 5 0 0 0 0 0 0.00 6 0 0 0 0 0 0.00 7 0 0 0 0 0 0.00 8 0 0 0 0 0 0.00 9 0 0 0 0 0 0.00 10 0 0 0 0 0 0.00 11 0 0 0 0 0 0.00 12 0 0 0 0 0 0.00 13 0 0 0 0 0 0.00 14 0 0 0 0 0 0.00 15 0 0 0 0 0 0.00 16 0 0 0 0 0 0.00 17 0 0 0 0 0 0.00 18 0 0 0 0 0 0.00 19 0 0 0 0 0 0.00 20 0 0 0 0 0 0.00 21 0 0 0 0 0 0.00 22 0 0 0 0 0 0.00 23 0 0 0 0 0 0.00 24 0 0 0 0 0 0.00 25 0 0 0 0 0 0.00 26 0 0 0 0 0 0.00 27 0 0 0 0 0 0.00 28 0 0 0 0 0 0.00 29 0 0 0 0 0 0.00 30 0 0 0 0 0 0.00 TOTAL CFS 0 0 0 0 TOTAL AF 0 0 0 0 0 0.00 1 PICK SLOAN MISSOURI BASIN PROGRAM UNITED STATES BUREAU OF RECLAMATION WESTERN DIVISION WATER AND POWER SYSTEM AS OF 05/07/01 WATER AND POWER CONTROL DIVISION TIME: 11:03:34 LOVELAND, COLORADO APRIL 2001 EASTERN COLORADO PROJECTS GRAND LAKE - SHADOW MOUNTAIN RESERVOIRS - COMPUTATION OF DAILY INFLOWS O U T F L O W C O M P U T E D I N F L O W ELEVATION ADAMS CHANGE PUMPED TO G R A N D L A K E GRAND SHADOW TOTAL TUNNEL BY TOTAL OUTFLOW IN TOTAL FROM GL. - SM. P R E C TEMP DAY LAKE MTN STORAGE E.P.1 PASS STORAGE GRANBY 6SSW 1NW 6SSW (FEET) (FEET) (AF) (CFS) (CFS) (CFS) (AF) (AF) (AF) (AF) (AF) (CFS) (IN) (IN) MAX MIN 17700 1 8366.60 8366.65 17700 0 20 20 38 0 48 0 48 25 0.00 0.00 50 33 2 8366.60 8366.65 17700 0 20 20 40 0 50 0 50 25 0.00 0.00 53 28 3 8366.60 8366.65 17700 0 20 20 40 0 50 0 50 25 0.00 0.00 57 22 4 8366.60 8366.65 17700 3 20 23 46 0 56 0 56 28 0.00 0.00 55 22 5 8366.55 8366.62 17634 68 20 88 175 -66 119 60 59 30 0.00 0.00 54 23 6 8366.51 8366.60 17588 167 20 187 371 -46 335 236 99 50 0.02 0.04 48 28 7 8366.58 8366.68 17729 311 20 331 657 141 808 708 100 50 0.00 0.04 46 27 8 8366.60 8366.65 17700 294 20 314 623 -29 604 472 132 67 0.02 0.01 46 25 9 8366.59 8366.65 17694 194 20 214 424 -6 428 286 142 72 0.00 0.00 48 20 10 8366.60 8366.66 17713 96 20 116 230 19 259 143 116 58 0.00 0.02 50 15 11 8366.61 8366.68 17745 11 20 31 61 32 103 0 103 52 0.14 0.41 35 24 12 8366.61 8366.65 17705 23 20 43 85 -40 55 0 55 28 0.01 0.01 37 14 13 8366.60 8366.65 17700 20 20 40 79 -5 84 0 84 42 0.02 0.03 44 22 14 8366.60 8366.65 17700 19 20 39 77 0 87 0 87 44 0.03 0.03 46 19 15 8366.59 8366.64 17681 20 20 40 79 -19 70 0 70 35 0.00 0.00 51 19 16 8366.58 8366.64 17676 20 20 40 79 -5 84 0 84 42 0.00 0.00 55 21 17 8366.58 8366.65 17689 20 20 40 79 13 102 0 102 51 0.00 0.00 63 21 18 8366.64 8366.71 17800 21 20 41 81 111 202 0 202 102 0.00 0.00 67 24 19 8366.69 8366.75 17879 22 96 118 234 79 323 0 323 163 0.00 0.00 65 32 20 8366.65 8366.70 17792 22 227 249 494 -87 417 0 417 210 0.03 0.02 58 28 21 8366.59 8366.65 17694 22 178 200 397 -98 309 0 309 156 0.00 0.00 50 18 22 8366.59 8366.61 17641 22 170 192 381 -53 338 0 338 170 0.45 0.29 42 25 23 8366.56 8366.62 17639 17 56 73 145 -2 153 0 153 77 0.04 0.07 41 14 24 8366.59 8366.65 17694 15 20 35 69 55 134 0 134 68 0.00 0.00 51 24 25 8366.60 8366.65 17700 45 20 65 129 6 145 0 145 73 0.00 0.00 59 23 26 8366.60 8366.65 17700 66 41 107 212 0 222 0 222 112 0.00 0.00 63 23 27 8366.65 8366.72 17818 97 29 126 250 118 378 0 378 191 0.00 0.00 66 27 28 8366.70 8366.75 17884 13 273 286 567 66 643 0 643 324 0.00 0.00 62 28 29 8366.62 8366.66 17723 17 516 533 1057 -161 906 0 906 457 0.00 0.00 62 29 30 8366.60 8366.57 17594 95 324 419 831 -129 712 0 712 359 0.00 0.00 62 27 TOTAL CFS 1740 2310 4050 3186 53 24 TOTAL AF -106 3451.2 4585 8030 8030 -106 8224 1905 6319 6318 0.76 0.97 NOTE: USE FACTOR OF 1.98347 TO CONVERT CFS TO AF/DAY, 0.50417 TO CONVERT AF/DAY TO CFS FACTORS=2.066116 AND.483988 FOR 25 HR/DAY 1.900825 AND .526087 FOR 23 HR/DAY 1 WATER DIVERTED FROM WEST SLOPE THRU ADAMS TUNNEL 1 PICK SLOAN MISSOURI BASIN PROGRAM UNITED STATES BUREAU OF RECLAMATION WESTERN DIVISION WATER AND POWER SYSTEM AS OF 05/07/01 WATER AND POWER CONTROL DIVISION TIME: 11:03:34 LOVELAND, COLORADO APRIL 2001 EASTERN COLORADO PROJECTS GRANBY RESERVOIR - COMPUTATION OF DAILY INFLOWS O U T F L O W C O M P U T E D I N F L O W CHANGE NATURAL LAKE TOTAL PUMPED SPILL SEEP TOTAL OUTFLOW IN TOTAL INFLOW FROM FROM FROM TO INFLOW YMCA ELEV STORAGE TO SM VALVES WAY AGE STORAGE SM W.CR W.GAP GRANBY GR-GL-SM GAGE DAY (FEET) (AF) (CFS) (CFS) (CFS) (CFS) (CFS) (AF) (AF) (AF) (CFS) (CFS) (CFS) (CFS) (CFS) (CFS) (CFS) 341791 1 8249.78 341849 0 20 0 5.0 25 48 58 137 72 20 0 0 52 77 0 2 8249.80 341966 0 20 0 5.0 25 50 117 198 100 20 0 0 80 105 0 3 8249.85 342256 0 20 0 5.0 25 50 290 371 187 20 100 0 67 92 0 4 8250.00 343128 0 20 0 5.0 25 50 872 953 480 20 365 0 95 123 0 5 8250.11 343769 30 20 0 5.0 55 109 641 781 394 20 283 0 91 121 0 6 8250.17 344118 119 20 0 5.0 144 286 349 666 336 20 146 0 170 220 0 7 8250.07 343536 357 20 0 5.0 382 758 -582 207 104 20 0 0 84 134 0 8 8250.00 343128 238 20 0 5.0 263 522 -408 145 73 20 0 0 53 120 0 9 8249.97 342954 144 20 0 5.0 169 335 -174 192 97 20 0 0 77 149 0 10 8249.96 342896 72 20 0 5.0 97 192 -58 165 83 20 0 0 63 121 0 11 8250.00 343128 0 20 0 5.0 25 50 232 313 158 20 14 0 124 176 0 12 8250.02 343245 0 20 0 5.0 25 50 117 198 100 20 0 0 80 108 0 13 8250.04 343361 0 20 0 5.0 25 50 116 197 99 20 0 0 79 121 0 14 8250.05 343419 0 20 0 5.0 25 50 58 139 70 20 0 0 50 94 0 15 8250.07 343536 0 20 0 5.0 25 50 117 198 100 20 0 0 80 115 0 16 8250.09 343652 0 20 0 5.0 25 50 116 197 99 20 0 0 79 121 0 17 8250.11 343769 0 20 0 3.0 23 46 117 194 98 20 0 0 78 129 0 18 8250.14 343944 0 20 0 3.0 23 46 175 252 127 20 0 0 107 209 0 19 8250.18 344177 0 20 0 3.0 23 46 233 310 156 96 0 0 60 223 0 20 8250.26 344643 0 20 0 3.0 23 46 466 543 274 227 0 0 47 257 0 21 8250.32 344993 0 20 0 3.0 23 46 350 427 215 178 0 0 37 193 0 22 8250.42 345577 0 20 0 3.0 23 46 584 661 333 170 0 0 163 333 0 23 8250.46 345810 0 20 0 3.0 23 46 233 310 156 56 0 0 100 177 23 24 8250.52 346161 0 20 0 3.0 23 46 351 428 216 20 135 0 61 129 22 25 8250.62 346745 0 20 0 3.0 23 46 584 661 333 20 240 0 73 146 22 26 8250.69 347155 0 20 0 3.0 23 46 410 487 246 41 89 0 116 228 23 27 8250.72 347331 0 20 0 3.0 23 46 176 253 128 29 0 0 99 290 23 28 8250.82 347916 0 20 0 3.0 23 46 585 662 334 273 0 0 61 385 24 29 8251.01 349030 0 20 0 3.0 23 46 1114 1191 600 516 0 0 84 541 24 30 8251.19 350087 0 37 0 3.0 40 79 1057 1167 588 324 84 0 180 539 35 TOTAL CFS 960 617 0 122.0 1699 6356 2310 1456 0 2590 5776 196 TOTAL AF 8296 1905 1231 0 241.6 3377 3377 8296 12603 12603 4585 2889 0 5133 11449 391 NOTE: USE FACTOR OF 1.98347 TO CONVERT CFS TO AF/DAY, 0.50417 TO CONVERT AF/DAY TO CFS FACTORS=2.066116 AND.483988 FOR 25 HR/DAY 1.900825 AND .526087 FOR 23 HR/DAY 1 PICK SLOAN MISSOURI BASIN PROGRAM UNITED STATES BUREAU OF RECLAMATION WESTERN DIVISION WATER AND POWER SYSTEM AS OF 05/07/01 WATER AND POWER CONTROL DIVISION TIME: 11:03:34 LOVELAND, COLORADO APRIL 2001 EASTERN COLORADO PROJECTS MARYS AND ESTES WATER REGULATION BIG THOMPSON RIVER S T O R A G E LAKE E S T E S ELVATION TOTAL ESTES B Y P A S S CHANGE WIND O L Y M P U S COM- P A R K IN ADAMS RIVER PUTED MARYS ESTES MARYS LAKE MARYS LAKE STOR- TUNNEL DIVER- T U N N E L NATIVE BELOW SKIM POWER POWER PREC TEMP LAKE ESTES LAKE ESTES AGE 1 SION INFLOW PLANT PLANT DAY (FT) (FT) (AF) (AF) (AF) (AF) (CFS) (CFS) (AF) (CFS) (CFS) (CFS) (CFS) (AF) (AF) (IN) (MAX) (MIN) +8000. +7400. 335 2499 1 22.62 71.53 318 2467 -49 0.0 0.0 0.00 28.5 15.0 19.0 29.0 0 0 0 0.00 57 41 2 22.62 71.17 318 2408 -59 0.0 0.0 0.00 65.5 33.0 34.0 31.0 0 0 0 0.00 54 36 3 22.62 70.62 318 2320 -88 0.0 0.0 0.00 89.3 45.0 32.0 31.0 0 0 0 0.00 58 33 4 22.62 70.30 318 2270 -50 6.0 3.0 0.00 53.6 27.0 29.0 30.0 0 5 0 0.00 57 28 5 22.62 70.13 318 2243 -27 134.9 68.0 0.00 35.7 18.0 -33.0 30.0 0 135 0 0.00 58 29 6 26.13 70.09 417 2237 93 331.2 167.0 0.00 194.4 98.0 7.0 30.0 0 160 0 0.00 48 38 7 30.48 70.37 560 2281 187 616.9 311.0 0.00 396.7 200.0 11.0 29.0 0 0 0 0.00 51 34 8 34.05 70.60 692 2317 168 583.1 294.0 0.00 396.7 200.0 20.0 30.0 0 0 0 0.00 44 29 9 34.52 71.70 710 2494 195 384.8 194.0 0.00 162.6 82.0 15.0 30.0 0 0 0 0.00 50 31 10 36.07 72.29 771 2592 159 190.4 96.0 0.00 15.9 8.0 21.0 30.0 0 0 0 0.24 33 28 11 35.74 72.29 758 2592 -13 21.8 11.0 0.00 19.8 10.0 22.0 30.0 0 0 0 0.32 40 28 12 33.52 72.77 672 2673 -5 45.6 23.0 0.00 17.9 9.0 13.0 30.0 0 0 0 0.04 38 25 13 29.23 73.62 517 2820 -8 39.7 20.0 0.00 17.9 9.0 16.0 31.0 0 0 0 0.00 44 28 14 29.21 73.59 516 2815 -6 37.7 19.0 0.00 21.8 11.0 19.0 30.0 0 0 0 0.00 46 26 15 29.20 73.37 516 2777 -38 39.7 20.0 0.00 41.7 21.0 11.0 29.0 0 0 0 0.00 55 26 16 29.32 73.18 520 2744 -29 39.7 20.0 0.00 41.7 21.0 16.0 30.0 0 0 0 0.00 37 26 17 29.55 73.04 528 2720 -16 39.7 20.0 0.00 29.8 15.0 17.0 30.0 0 0 0 0.00 59 24 18 29.81 72.99 537 2711 0 41.7 21.0 0.00 27.8 14.0 23.0 30.0 0 0 0 0.00 69 28 19 30.02 73.05 544 2721 17 43.6 22.0 0.00 27.8 14.0 30.0 30.0 0 0 0 0.00 63 43 20 30.29 73.19 554 2745 34 43.6 22.0 0.00 27.8 14.0 39.0 30.0 0 44 0 0.00 53 40 21 30.61 73.30 565 2764 30 43.6 22.0 0.00 29.8 15.0 38.0 30.0 0 44 0 0.95 42 32 22 30.78 73.38 571 2778 20 43.6 22.0 0.00 27.8 14.0 32.0 30.0 0 44 0 0.64 34 28 23 30.99 73.54 579 2806 36 33.7 17.0 0.00 27.8 14.0 44.0 29.0 0 0 0 0.00 44 26 24 31.21 71.85 586 2519 -280 29.8 15.0 0.00 301.5 152.0 48.0 51.0 0 0 0 0.00 51 38 25 31.47 69.93 596 2212 -297 89.3 45.0 0.00 390.7 197.0 50.0 47.0 0 24 0 0.00 58 28 26 31.58 70.13 600 2243 35 130.9 66.0 0.00 105.1 53.0 56.0 52.0 0 0 0 0.00 68 29 27 34.01 70.93 690 2370 217 192.4 97.0 0.00 31.7 16.0 77.0 50.0 0 0 0 0.00 67 31 28 32.21 71.65 623 2486 49 25.8 13.0 0.00 27.8 14.0 100.0 75.0 0 0 0 0.00 66 36 29 32.38 72.07 629 2556 76 33.7 17.0 0.00 23.8 12.0 138.0 105.0 0 0 0 0.00 63 45 30 36.66 72.17 794 2572 181 188.4 95.0 1.00 25.8 13.0 146.0 139.0 0 0 0 0.00 64 52 TOTAL CFS 1740.0 1364.0 1090.0 1208.0 0 TOTAL AF 459 73 532 1.98 2160. 2394. 0 456 0 2.19 52 32 3451.2 2704.2 NOTE: USE FACTOR OF 1.98347 TO CONVERT CFS TO AF/DAY, 0.50417 TO CONVERT AF/DAY TO CFS FACTORS=2.066116 AND.483988 FOR 25 HR/DAY; 1.900825 AND .526087 FOR 23 HR/DAY 1 EAST PORTAL ADAMS TUNNEL MINUS WIND RIVER 1 PICK SLOAN MISSOURI BASIN PROGRAM UNITED STATES BUREAU OF RECLAMATION WESTERN DIVISION WATER AND POWER SYSTEM AS OF 05/07/01 WATER AND POWER CONTROL DIVISION TIME: 11:03:34 LOVELAND, COLORADO APRIL 2001 EASTERN COLORADO PROJECTS MARYS LAKE & LAKE ESTES INFLOW/OUTFLOW REGULATION G A U G E D F L O W ESTES & LAKE BIG BIG MARYS ESTES THOMP- THOMP- TOTAL COM- SON SON CHANGE PUTED ADAMS WIND FISH RIVER T O T A L OLYMPUS RIVER T O T A L IN NATIVE TUNNEL RIVER CREEK ABOVE I N F L O W TUNNEL BELOW O U T F L O W STORAGE INFLOW 1 2 DAY (CFS) (CFS) (CFS) (CFS) (CFS) (AF) (CFS) (CFS) (CFS) (AF) (AF) (CFS) 1 0.0 0.0 0.0 10.0 19.0 36 15.0 29.0 44.0 84 -49 19.0 2 0.0 0.0 0.0 10.0 34.0 67 33.0 31.0 64.0 127 -59 34.0 3 0.0 0.0 0.0 10.0 32.0 63 45.0 31.0 76.0 151 -88 32.0 4 3.0 0.0 0.0 13.0 32.0 63 27.0 30.0 57.0 113 -50 29.0 5 68.0 0.0 0.0 14.0 35.0 69 18.0 30.0 48.0 95 -27 -33.0 6 167.0 0.0 0.0 16.0 174.0 345 98.0 30.0 128.0 254 93 7.0 7 311.0 0.0 0.0 15.0 322.0 639 200.0 29.0 229.0 454 187 11.0 8 294.0 0.0 0.0 15.0 314.0 623 200.0 30.0 230.0 456 168 20.0 9 194.0 0.0 0.0 15.0 209.0 415 82.0 30.0 112.0 222 195 15.0 10 96.0 0.0 0.0 16.0 117.0 232 8.0 30.0 38.0 75 159 21.0 11 11.0 0.0 0.0 16.0 33.0 65 10.0 30.0 40.0 79 -13 22.0 12 23.0 0.0 0.0 15.0 36.0 71 9.0 30.0 39.0 77 -5 13.0 13 20.0 0.0 0.0 14.0 36.0 71 9.0 31.0 40.0 79 -8 16.0 14 19.0 0.0 0.0 14.0 38.0 75 11.0 30.0 41.0 81 -6 19.0 15 20.0 0.0 0.0 14.0 31.0 61 21.0 29.0 50.0 99 -38 11.0 16 20.0 0.0 0.0 15.0 36.0 71 21.0 30.0 51.0 101 -29 16.0 17 20.0 0.0 0.0 15.0 37.0 73 15.0 30.0 45.0 89 -16 17.0 18 21.0 0.0 0.0 17.0 44.0 87 14.0 30.0 44.0 87 0 23.0 19 22.0 0.0 0.0 25.0 52.0 103 14.0 30.0 44.0 87 17 30.0 20 22.0 0.0 0.0 31.0 61.0 121 14.0 30.0 44.0 87 34 39.0 21 22.0 0.0 0.0 31.0 60.0 119 15.0 30.0 45.0 89 30 38.0 22 22.0 0.0 0.0 23.0 54.0 107 14.0 30.0 44.0 87 20 32.0 23 17.0 0.0 0.0 33.0 61.0 121 14.0 29.0 43.0 85 36 44.0 24 15.0 0.0 0.0 38.0 63.0 125 152.0 51.0 203.0 403 -280 48.0 25 45.0 0.0 0.0 51.0 95.0 188 197.0 47.0 244.0 484 -297 50.0 26 66.0 0.0 0.0 57.0 122.0 242 53.0 52.0 105.0 208 35 56.0 27 97.0 0.0 0.0 70.0 174.0 345 16.0 50.0 66.0 131 217 77.0 28 13.0 0.0 0.0 96.0 113.0 224 14.0 75.0 89.0 177 49 100.0 29 17.0 0.0 0.0 132.0 155.0 307 12.0 105.0 117.0 232 76 138.0 30 95.0 1.0 0.0 143.0 241.0 478 13.0 139.0 152.0 301 181 146.0 TOTAL CFS 1740.0 0.0 984.0 2830.0 1364.0 1208.0 2572.0 1090.0 AF 3451.2 2.0 0.0 1950.9 5611.6 5606 2704.2 2393.6 5097.8 5094 532 2160.4 NOTE: USE FACTOR OF 1.98347 TO CONVERT CFS TO AF/DAY, 0.50417 TO CONVERT AF/DAY TO CFS FACTORS=2.066116 AND.483988 FOR 25 HR/DAY; 1.900825 AND .526087 FOR 23 HR/DAY 1 EAST PORTAL ADAMS TUNNEL MINUS WIND RIVER 2 LAKE ESTES COMPUTED NATIVE INFLOW PLUS ADAMS TUNNEL 1 PICK SLOAN MISSOURI BASIN PROGRAM UNITED STATES BUREAU OF RECLAMATION WESTERN DIVISION WATER AND POWER SYSTEM AS OF 05/07/01 WATER AND POWER CONTROL DIVISION TIME: 11:03:34 LOVELAND, COLORADO APRIL 2001 EASTERN COLORADO PROJECTS FOOTHILLS WATER REGULATION PINEWOOD F L A T I R O N CARTER LAKE HORSETOOTH BY- AVG PASS ELEV STORAGE ELEV STORAGE FLATIRON PUMP FLATIRON # 3 GEN. ELEV ELEV STORAGE ELEV STORAGE POLE (FT) (AF) (FT) (FT) HILL +6500. +5400. (AF) MWH KWH/AF (AF) AVG. MWH KWH/AF (AF) AVG. +5400. (FT) (AF) (FT) (AF) (AF) DAY CFS CFS 1419 478 108172 45968 1 71.2 1427 65.4 444 0.0 361.3 0.0 0.0 0.0 221.6 0.0 0.0 65.8 5755.38 108115 5358.88 45914 0 2 71.8 1470 65.1 432 0.0 361.2 0.0 0.0 0.0 221.6 0.0 0.0 65.3 5755.29 108014 5358.87 45903 0 3 72.2 1500 64.8 421 0.0 361.1 0.0 0.0 0.0 221.6 0.0 0.0 65.1 5755.23 107946 5358.87 45903 0 4 72.3 1508 65.8 459 0.0 361.0 0.0 0.0 0.0 221.6 0.0 0.0 65.3 5755.19 107901 5358.86 45892 0 5 72.4 1515 65.1 432 0.0 360.9 0.0 0.0 0.0 221.6 0.0 0.0 65.4 5755.11 107811 5358.75 45772 36 6 72.3 1508 67.6 530 0.0 360.9 0.0 0.0 0.0 221.6 0.0 0.0 65.0 5755.11 0 5358.75 45772 43 7 75.0 1725 66.5 486 0.0 360.9 0.0 0.0 0.0 221.6 0.0 0.0 68.2 5755.11 0 5358.89 45924 0 8 76.4 1846 68.1 551 0.0 360.6 0.0 0.0 0.0 221.5 0.0 0.0 65.0 5754.90 107574 5358.98 46023 0 9 77.2 1918 67.8 538 0.0 360.5 0.0 0.0 0.0 221.5 0.0 0.0 68.5 5754.84 107506 5358.92 45957 0 10 77.2 1918 66.7 494 0.0 360.5 0.0 0.0 0.0 221.5 0.0 0.0 67.1 5754.86 107529 5358.94 45979 0 11 77.1 1909 66.7 494 0.0 360.4 0.0 0.0 0.0 221.5 0.0 0.0 66.5 5754.78 107439 5358.96 46001 0 12 75.3 1751 69.7 619 0.0 360.3 0.0 0.0 0.0 221.5 0.0 0.0 67.6 5754.73 107382 5358.94 45979 0 13 75.3 1751 68.8 580 0.0 360.3 0.0 0.0 0.0 221.5 0.0 0.0 69.2 5754.73 0 5358.87 45903 0 14 75.3 1751 67.9 542 0.0 360.3 0.0 0.0 0.0 221.5 0.0 0.0 68.4 5754.73 0 5358.83 45859 0 15 75.7 1785 67.1 510 0.0 360.0 0.0 0.0 0.0 221.4 0.0 0.0 67.5 5754.49 107112 5358.73 45750 0 16 74.3 1666 69.8 623 0.0 359.9 0.0 0.0 0.0 221.4 0.0 0.0 68.5 5754.47 107090 5358.69 45707 0 17 74.5 1683 67.8 538 0.0 359.8 0.0 0.0 0.0 221.4 0.0 0.0 68.5 5754.39 107000 5358.64 45652 0 18 74.6 1691 66.7 494 0.0 359.5 0.0 0.0 0.0 221.3 0.0 0.0 67.4 5754.20 106786 5358.49 45490 0 19 74.8 1708 65.2 436 0.0 359.3 0.0 0.0 0.0 221.3 0.0 0.0 65.9 5754.08 106651 5358.45 45446 0 20 74.0 1642 66.1 470 0.0 359.3 0.0 0.0 0.0 221.3 0.0 0.0 64.7 5754.08 0 5358.35 45338 28 21 72.9 1554 67.4 522 0.0 359.3 0.0 0.0 0.0 221.3 0.0 0.0 66.7 5754.08 0 5358.41 45403 30 22 72.1 1493 68.2 555 0.0 358.8 0.0 0.0 0.0 221.2 0.0 0.0 66.8 5753.70 106225 5358.39 45381 28 23 71.8 1470 67.8 538 0.0 358.5 0.0 0.0 0.0 221.2 0.0 0.0 66.9 5753.53 106034 5358.37 45360 0 24 74.1 1650 67.0 506 0.0 358.3 0.0 0.0 0.0 221.1 0.0 0.0 67.1 5753.37 105854 5358.37 45360 0 25 76.2 1829 66.9 502 0.0 358.0 0.0 0.0 0.0 221.1 0.0 0.0 66.0 5753.19 105653 5358.49 45490 0 26 73.6 1609 71.6 703 0.0 357.8 0.0 0.0 0.0 221.0 0.0 0.0 68.7 5753.03 105474 5358.49 45490 0 27 73.8 1625 69.6 614 0.0 357.8 0.0 0.0 0.0 221.0 0.0 0.0 70.5 5753.03 0 5358.45 45446 0 28 73.8 1625 68.5 567 0.0 357.8 0.0 0.0 0.0 221.0 0.0 0.0 68.8 5753.03 0 5358.42 45414 0 29 73.9 1634 66.9 502 0.0 357.0 0.0 0.0 0.0 220.9 0.0 0.0 67.6 5752.51 104892 5358.39 45381 0 30 72.6 1531 68.2 555 0.0 356.4 0.0 0.0 0.0 220.8 0.0 0.0 66.9 5752.13 104468 5358.27 45252 0 TOTAL CFS 0.0 TOTAL AF 112 77 0.0 0.0 0.0 0.0 0.0 0.0 -3704 -716 165 NOTE: USE FACTOR OF 1.98347 TO CONVERT CFS TO AF/DAY, 0.50417 TO CONVERT AF/DAY TO CFS FACTORS=2.066116 AND.483988 FOR 25 HR/DAY 1.900825 AND .526087 FOR 23 HR/DAY 1 PICK SLOAN MISSOURI BASIN PROGRAM UNITED STATES BUREAU OF RECLAMATION WESTERN DIVISION WATER AND POWER SYSTEM AS OF 05/07/01 WATER AND POWER CONTROL DIVISION TIME: 11:03:34 LOVELAND, COLORADO APRIL 2001 EASTERN COLORADO PROJECTS LOVELAND WASTE- WINDY SURPLUS DECREE SKIM TOTAL WAY INFLOW WIND WINDY GAP WATER WATER WATER DILLE TO B. T. TO GAP OPEN THRU THRU THRU B. T. POWER HORSE- DAY RIVER METERS FLOW DILLE DILLE DILLE TUNNEL RIVER PLANT TOOTH 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.40 2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.00 4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.00 7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.00 8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.00 9 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.00 10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.00 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.70 12 0.00 0.00 2.50 0.00 0.00 0.00 0.00 0.00 0.00 24.60 13 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 27.00 14 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 26.00 15 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00 16 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 26.00 17 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 18 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 22.00 19 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 34.00 20 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 27.50 21 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 30.00 22 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 23 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 24 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 25 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 91.00 26 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 66.30 27 0.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 35.00 28 0.00 0.00 4.20 0.00 0.00 0.00 0.00 0.00 0.00 26.00 29 0.00 0.00 4.20 0.00 0.00 0.00 0.00 0.00 0.00 26.00 30 0.00 0.00 4.20 0.00 0.00 0.00 0.00 0.00 0.00 24.00 TOTAL CFS 0.00 0.00 75.10 0.00 0.00 0.00 0.00 0.00 0.00 1019.50 TOTAL AF 0.00 0.00 148.96 0.00 0.00 0.00 0.00 0.00 0.00 2020.54 ADJUSTMENT AF 37.70 TOTAL FLOW OR DELIVERY AF 1982.84 METERED DELIVERY AF 431.90 NOTE: AVERAGE DAILY CFS UNLESS NOTED OTHERWISE * TOTAL FLOW INCLUDES NON-CHARGE WATER 1 PICK SLOAN MISSOURI BASIN PROGRAM UNITED STATES BUREAU OF RECLAMATION WESTERN DIVISION WATER AND POWER SYSTEM AS OF 05/07/01 WATER AND POWER CONTROL DIVISION TIME: 11:03:34 LOVELAND, COLORADO APRIL 2001 EASTERN COLORADO PROJECTS WATER ORDERS - NORTHERN COLORADO WATER CONSERVANCY DISTRICT & MUNICIPAL SUBDISTRICT ST. HANSEN CUMULATIVE VRAIN BIG FEEDER HANSEN DIXON DAILY SEASON ABOVE SUPPLY THOMPSON CANAL SUPPLY FEEDER TOTAL TOTAL DAY FLATIRON CANAL RIVER TURNOUTS CANAL CANAL ORDERS (AF) 18083.90 1 0.00 47.80 0.00 9.60 0.00 0.00 57.40 18198.70 2 0.00 10.00 0.00 5.00 0.00 0.00 15.00 18228.70 3 0.00 10.40 0.00 10.00 0.00 0.00 20.40 18269.50 4 0.00 13.00 0.00 10.00 0.00 0.00 23.00 18315.50 5 0.00 13.00 0.00 10.00 0.00 0.00 23.00 18361.50 6 0.00 13.00 0.00 10.00 0.00 0.00 23.00 18407.50 7 0.00 13.00 0.00 10.00 0.00 0.00 23.00 18453.50 8 0.00 13.00 0.00 10.00 0.00 0.00 23.00 18499.50 9 0.00 13.00 0.00 10.00 0.00 0.00 23.00 18545.50 10 0.00 13.00 0.00 10.00 0.00 0.00 23.00 18591.50 11 0.00 13.00 0.00 8.30 0.00 0.00 21.30 18634.10 12 0.00 13.00 0.00 4.40 10.50 0.00 27.90 18689.90 13 0.00 13.00 0.00 4.00 15.80 0.00 32.80 18755.50 14 0.00 13.00 0.00 4.00 13.50 0.00 30.50 18816.50 15 0.00 13.00 0.00 4.00 13.50 0.00 30.50 18877.50 16 0.00 13.00 0.00 4.00 10.90 0.00 27.90 18933.30 17 0.00 13.00 0.00 4.00 9.00 0.00 26.00 18985.30 18 0.00 13.00 0.00 4.00 9.00 0.00 26.00 19037.30 19 0.00 41.00 0.00 4.00 11.30 0.00 56.30 19149.90 20 0.00 55.00 0.00 6.50 13.00 0.00 74.50 19298.90 21 0.00 55.00 0.00 8.00 13.00 0.00 76.00 19450.90 22 0.00 55.00 0.00 8.00 13.00 0.00 76.00 19602.90 23 0.00 55.00 0.00 8.00 10.50 0.00 73.50 19749.90 24 0.00 55.00 0.00 8.00 9.00 0.00 72.00 19893.90 25 0.00 55.00 0.00 8.00 9.00 0.00 72.00 20037.90 26 0.00 55.00 0.00 12.70 9.00 0.00 76.70 20191.30 27 0.00 55.00 0.00 15.00 9.00 0.00 79.00 20349.30 28 0.00 55.00 0.00 15.00 9.00 0.00 79.00 20507.30 29 0.00 55.00 0.00 15.00 9.00 0.00 79.00 20665.30 30 0.00 145.00 0.00 15.00 10.80 0.00 170.80 21006.90 TOTAL CFS 0.00 999.20 0.00 254.50 207.80 0.00 1461.50 TOTAL AF 0.00 1998.40 0.00 509.00 415.60 0.00 2923.00 21006.90 METERED DELIVERY AF 3.30 1545.50 37.70 0.00 1278.80 2865.30 23872.20 TOTAL FLOW OR DELIVERY AF * 3.30 3543.90 0.00 546.70 415.60 1278.80 5788.30 23872.20 NON-CHARGE DELIVERY AF 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1719.70 METERED DELIVERY AF 1 CBT PROJECT APRIL 2001 PREC. AND EVAP. SUMMARY SHADOW MTN. ESTES POLE CARTER DILLON GREEN MOUNTAIN WILLOW CR. GL6SSW GL1NW GRANBY GRAND LAKE PARK HILL FLATIRON LAKE HORSETOOTH PREC. PREC. EVAP. EVAP. PREC. PREC. EVAP. EVAP. PREC. PREC. PREC. EVAP. PREC. EVAP. (IN) (IN) (AF) (AF) (IN) (IN) (AF) (AF) (IN) (IN) (IN) (AF) (IN) (AF) 1 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.11 7. 0.00 17. 2 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 12. 0.00 11. 3 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 12. 0.00 11. 4 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 8. 0.00 7. 5 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 5. 0.00 5. 6 0.19 0.00 5. 1. 0.02 0.04 32. 10. 0.00 0.00 0.00 13. 0.07 6. 7 0.00 0.00 5. 1. 0.00 0.04 32. 10. 0.00 0.00 0.00 12. 0.00 11. 8 0.00 0.16 5. 1. 0.02 0.01 32. 10. 0.00 0.00 0.01 9. 0.00 9. 9 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.05 0. 0.00 0. 10 0.44 0.44 5. 1. 0.00 0.02 32. 10. 0.24 0.00 0.92 0. 0.18 0. 11 0.03 0.04 5. 1. 0.14 0.41 32. 10. 0.32 0.85 0.05 64. 0.91 -16. 12 0.00 0.00 5. 1. 0.01 0.01 32. 10. 0.04 0.00 0.00 6. 0.00 6. 13 0.00 0.00 5. 1. 0.02 0.03 32. 10. 0.00 0.00 0.00 12. 0.00 11. 14 0.00 0.00 5. 1. 0.03 0.03 32. 10. 0.00 0.00 0.00 12. 0.00 12. 15 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.02 12. 0.00 13. 16 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 7. 0.00 7. 17 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 10. 0.00 10. 18 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 15. 0.00 15. 19 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 22. 0.00 21. 20 0.00 0.00 5. 1. 0.03 0.02 32. 10. 0.00 0.00 0.00 6. 0.03 3. 21 0.32 0.00 5. 1. 0.00 0.00 32. 10. 0.95 0.00 0.00 14. 0.18 -2. 22 0.06 1.13 5. 1. 0.45 0.29 32. 10. 0.64 0.00 1.15 -31. 1.05 -21. 23 0.00 0.00 5. 1. 0.04 0.07 32. 10. 0.00 1.25 0.00 9. 0.00 9. 24 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 12. 0.00 12. 25 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 15. 0.00 15. 26 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 16. 0.00 15. 27 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 15. 0.00 15. 28 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 16. 0.00 15. 29 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 18. 0.00 18. 30 0.00 0.00 5. 1. 0.00 0.00 32. 10. 0.00 0.00 0.00 14. 0.00 13. TOTALS 1.04 1.77 153. 38. 0.76 0.97 952. 301. 2.19 2.10 2.31 341. 2.42 248. 1 UPPER COLORADO RIVER DAILY DATA COLLECTION FOR APRIL 2001 NATIONAL WEATHER SERVICE - SALT LAKE CITY U.S. BUREAU OF RECLAMATION LOVELAND, COLORADO DAY L A K E G R A N B Y WILLOW CREEK RES. G R E E N M O U N T A I N R E S. INFLOW OUTFLOW GL6SSW GL6SSW GL6SSW INFLOW OUTFLOW INFLOW OUTFLOW MAX MIN MAX MIN PREC TEMP TEMP PREC (CFS) (CFS) TEMP TEMP (CFS) (CFS) 1 77 25 50 33 0.00 26 8 134 146 54 29 0.00 2 105 25 53 28 0.00 28 8 149 146 56 27 0.00 3 92 25 57 22 0.00 29 8 188 148 60 27 0.00 4 123 25 55 22 0.00 13 9 148 145 56 26 0.00 5 121 25 54 23 0.00 22 10 211 143 54 31 0.00 6 220 25 48 28 0.02 43 10 169 143 49 26 0.00 7 134 25 46 27 0.00 35 9 202 143 47 25 0.00 8 120 25 46 25 0.02 36 8 147 144 41 21 0.16 9 149 25 48 20 0.00 35 8 147 144 49 21 0.00 10 121 25 50 15 0.00 29 8 210 136 46 24 0.44 11 176 25 35 24 0.14 42 8 241 144 38 18 0.04 12 108 25 37 14 0.01 26 8 182 146 43 22 0.00 13 121 25 44 22 0.02 31 8 213 201 44 21 0.00 14 94 25 46 19 0.03 30 8 192 327 45 20 0.00 15 115 25 51 19 0.00 27 8 170 327 54 24 0.00 16 121 25 55 21 0.00 30 7 228 328 58 23 0.00 17 129 23 63 21 0.00 36 8 196 329 64 25 0.00 18 209 23 67 24 0.00 44 7 229 334 66 43 0.00 19 223 23 65 32 0.00 56 9 279 333 60 34 0.00 20 257 23 58 28 0.03 61 8 252 258 48 23 0.00 21 193 23 50 18 0.00 51 8 254 102 45 26 0.00 22 333 23 42 25 0.45 51 8 272 101 28 20 1.13 23 177 23 41 14 0.04 38 8 251 99 42 28 0.00 24 129 23 51 24 0.00 41 8 262 161 53 24 0.00 25 146 23 59 23 0.00 38 9 257 202 60 26 0.00 26 228 23 63 23 0.00 60 8 279 267 66 28 0.00 27 290 23 66 27 0.00 65 8 298 353 70 35 0.00 28 385 23 62 28 0.00 97 8 339 199 62 33 0.00 29 541 23 62 29 0.00 113 8 371 103 63 30 0.00 30 539 40 62 27 0.00 111 8 404 104 62 45 0.00